Student 2019/20 - Qualification awarded
Student 2019/20Fields required from institutions in All fieldsQualification awarded | return to field list | valid entries |
Type | field |
Short name | QUAL |
Description |
This field records the qualification awarded. |
Applicable to | England Northern Ireland Scotland Wales |
Coverage | All qualification awarded records |
Valid entries and labels | |
Notes |
For some students whose course qualification aim may be, for example, first degree but who terminate their studies after a successful second year, occasionally a different qualification such as an HND or DipHE may be awarded. It is the awarded qualification which must be coded here. Qualifications should be returned only when the awarding body has confirmed that the student has gained the award. Funding councils may check qualifications returned against data provided by awarding bodies, and query providers about discrepancies. This field records the qualification obtained by the student during the reporting year. If a student is awarded more than one qualification during the reporting year then the QualificationsAwarded element should be repeated. A qualification obtained is not assumed from Instance.RSNEND and Instance.ENDDATE. The coding frame for this field is designed to support the alignment of course qualifications with national frameworks, with the first letter indicating the level. Codes of similar type at different levels have the same two-digit suffix. Further comprehensive guidance on qualification levels and alignments may be found in the COURSEAIM field. Some professional awarding bodies do not currently release results information to providers. Where this is the case, providers should leave this field blank and complete field Instance.RSNEND with code 98 'Completion of course - result unknown'. Interim Awards: In most cases qualifications are obtained at the end of a course. Therefore typically where there is a QualificationsAwarded a reason for leaving and a date left would be expected. It is recognised, however, that there are a few courses where interim qualifications are actually awarded and so these fields may not be completed. Providers that award interim qualifications for students who are continuing on a course can return this information to HESA in the reporting year in which the interim qualification is awarded if they wish, in which case Instance.ENDDATE should not be completed in order to indicate that these students are continuing on the course. However records returned in this way will not be included in the Graduate Outcomes survey population. Alternatively providers can return interim qualifications when the student completes the course by completing the QualificationsAwarded fields and indicating the date the student completed the course in Instance.ENDDATE. Records returned in this way will be included in the Graduate Outcomes survey population (assuming that all other criteria are met). Resit exams and/or results from late exam boards: Students who complete their instance by 31 July but who have resit examinations to take and/or whose final confirmation of award by exam boards may be after this date should be returned to HESA as leavers, with a dateleft in the reporting period ending that 31 July. If their results are known before the Student record data collection closes, these results should be included in the return. Records for such students will be included in the Graduate Outcomes survey population (assuming that they meet all other criteria). However, if the results are not known before the Student Record data collection closes, a record should be submitted with an ENDDATE in the reporting period ending that 31 July completed and code 98 'Completion of course - result unknown' in Instance.RSNEND. Once known, for providers in England, Wales and Northern Ireland, these results should be returned in the next reporting period but Instance.MODE should not be updated. For providers in Scotland, the appropriate dormant code should be returned in Instance.MODE. For all providers, the date returned in Instance.ENDDATE must be the original date left and not be up-dated. Records returned in this way will not be included in the Graduate Outcomes survey population. When necessary, providers should decommit their return late in the data collection period in order to include results from late exam or re-sit boards or to reflect where an award has been rescinded. This same guidance applies to ITT DfE students where the award of QTS may be delayed. ITT DfE students may finish their course in June/July of the HESA reporting year. This date should be date recorded in Instance.ENDDATE. However the provider may not know whether the student has been awarded QTS until later. If award information is known before the HESA data collection closes at the end of November, then this should be included in QUAL and QualificationsAwarded.OUTCOME. DfE have confirmed that trainees who obtain a successful award up until 1 November, and are shown as such in the main HESA return, will be counted in the profiles publication. Award dates after 31 October should be included in the following HESA data collection. In neither case should Instance.ENDDATE be up-dated. It is expected that students coded other than 1 or 4 in OUTCOME who are subsequently awarded QTS should have this recorded in QualificationsAwarded.QUAL and QualificationsAwarded.OUTCOME in a subsequent return to HESA as an award from dormant status. Rescinded Awards: Where a student has an award made and Qualification awarded and ENDDATE were returned but then the award is rescinded, if the student receives a second award for the same Instance the Qualification awarded will need to be updated, to provide an accurate record of what the student achieved. |
Quality rules |
Quality rules relating to this entity are displayed here.
|
Reason required | To allow analysis of qualifications awarded including interim awards. |
Part of | |
Field length | 3 |
Minimum occurrences | 1 |
Maximum occurrences | 1 |
Schema components |
Element: QUAL
Data type: QUALCodeContentType |
Related fields | |
Owner | HESA |
Version | 1.4 |
Date modified | 2020-09-22 |
Change management notes | Additional guidance added when it is necessary for providers to decommit their return late. |
Contact Liaison by email or on +44 (0)1242 388 531.